Design, Engineering and Supervision
Tier III Data Centre with Total Building Area 1200 m2 and White Space 350m2. One Story building, raised floor Data Processing Space, associated equipment, storage and office building for up to 30 people. Air cooled equipment used with N+1 redundancy throughout.