645 square meter data center meeting TIA942 Tier III design requirements accommodating 104 air cooled racks including 22 high density 10 KW racks. With a 2N electrical infrastructure providing 1.5 MW on each leg with an N+1 UPS setup on each leg for extra protection. 700 KW water cooled air conditioning system through 12 dual coil CRAC Units working as N+2 setup. All structured cabling and fibre was factory pre-terminated.

AT A GLANCE
Customer Name Abu Dhabi Judiciary Department
Project Manager - PMCM Morganti
Location Abu Dhabi, United Arab Emirates
Project Duration 12 months
Project Status Completed